Hall 1:
- Year of construction 1995, hall building as warm storage, 15.28 m x 20.35 m
- single/two-storey combined masonry and steel construction with partially developed attic, no basement
- Storey height of the hall approx. 6.50 m; storey height on the ground floor and upper floor of the office wing approx. 2.85 m (clear room heights 2.20 m to 2.50 m, approx. 1.78 m in the area of the pitched roofs)
- Floor slabs in the office wing as reinforced concrete solid slabs
- Steel columns
- Masonry of the load-bearing walls d = 24 cm or 17.5 and 14 cm; interior walls d = 11.5 cm or 17.5 cm
- Single-flight steel staircase in the warehouse, double-flight solid staircase in the office wing
- Roof as steel frame construction, roof shape as flat pitched saddle roof
- Roof cladding with trapezoidal profiled sheets with ISO element insulation
- Façade with trapezoidal sheet metal cladding
- Walls in the office / corridor areas papered and painted with woodchip wallpaper; unplastered brickwork in the storage area, sanitary areas with floor-to-ceiling tiling all around, toilet area with approx. 1.6 m high tiling all around
- Ceilings in the office area papered and painted with woodchip wallpaper; surface-mounted lights installed; in the storage area with visible trapezoidal sheet metal cladding, in the sanitary area woodchip wallpaper, painted
- Windows as plastic windows with insulating glazing (external sun protection)
- Floors in the office wing with textile and tiled flooring, industrial screed with paint in the storage area, tiled flooring in the sanitary areas
- Storage area with electrically controlled sectional door
- Entrance door as plastic door with glass insert
- Gas central heating (ATAQ), year of construction approx. 2014, with decentralized hot water supply
- Compact and panel radiators with thermostatic valves; ceiling-mounted warm air heating in the warehouse
- Separate ladies' and men's rooms' toilets in the office wing
- Electrical installation in the office wing by means of electrical conduit at plinth level; sufficient equipment in the hall area, power connections available
- Office wing equipped with air-conditioning technology (individual split air-conditioning units, Daikin brand)
- Fiber optic connection available
Hall 2:
- Built in 1999, warehouse with workshop and side extension, 15.00 m x 27.68 m
- single-storey combined masonry and steel construction
- No basement, with solid intermediate ceiling in some areas
- Storey height of the warehouse approx. 6.50 m, clear room height of the workshop rooms approx. 2.50 m
- Edge supports as frame supports / internal/external supports made of steel
- Load-bearing walls with masonry d = 24 cm or 17.5 cm and 14 cm
- Interior walls with masonry d = 11.5 cm, 24 cm or 17.5 cm
- Single-flight solid staircase and single-flight steel staircase on intermediate level in lightweight construction
- Roof shape as a flat pitched saddle roof
- Heating system connected to the heating system in hall 1; workshop equipped with compact and panel radiators with thermostatic valves; warehouse with ceiling-mounted warm air heating
- Sufficient electrical installation, power connections available
Further information is available on request in our informative exposé!
Further features:
Type of parking space: Free parking space
Basement: NO
Structural condition: well maintained





















