Hall 1 with office wing:
- Year of construction approx. 2010/2011
- Hall in steel girder construction
- Floor area 30 m x 10 m
- Eaves height 3 meters
- Brick base
- Roof area equipped with transparent light strip; electrically operated roof hatches
- Exterior walls insulated, 22 cm inner shell, thermal wall elements d = 80 mm
- Fire protection wall between office wing and warehouse complex
- Office wing equipped with industrial laminate flooring
- Office wing divided into various workplace areas with customer reception, lounge and WCs
- Hall equipped with industrial flooring with appropriate coating
- Plastic windows with insulating glazing and security locks; external roller shutters also with security locks
- Plastic entrance door as security door with glass cut-outs
- Sectional door
- Air-conditioned office wing
- Network speed 100,000 Mbit
- Heating via gas boiler
- Photovoltaic system 17.5 kWh; year of construction 2011
Hall 2:
- Year of construction approx. 2017/2018
- Hall in steel girder construction
- Floor area 28 m x 12.25 m
- Eaves height 3.50 meters
- Brick base
- Roof structure with thermal roof elements, d = 118 mm
- Roof area equipped with transparent light strip; electrically operated roof hatches
- Exterior walls with thermal wall elements d = 80 mm
- Floor fitted with paving stones
- Plastic windows with insulating glazing and safety locks; external roller shutters also with safety locks
- Plastic entrance door with glass cut-outs
- Sectional door
- Cold hall, heating possible via gas boiler
Additional features:
- Fully fenced property with gate system
- Garden area with 2 biotopes
- Sufficient parking space on the property
- Biotopes are removable and owned by the owners
Further features:
Basement: NO
Structural condition: well maintained