Technical equipment & construction:
+ Solid construction with load-bearing masonry walls
+ Trapezoidal sheet metal cladding
+ Foundations made of reinforced concrete or strip foundations
Halls & docking stations:
+ Main storage hall: clear height approx. 4.20 m (to lower edge of roof structure)
+ Adjacent hall (former boiler house): usable interior height approx. 8.90 m
+ Docking stations covered on both sides for truck deliveries, protected from the weather
Office wing:
+ Several functionally designed rooms for administration, meetings, social rooms
+ Flexible room structure for operational adaptations
Technical infrastructure:
+ Electricity, gas and water connections fully available
+ Central gas heating from 2016
Outdoor area:
+ Paved maneuvering areas and parking spaces for cars & trucks
+ Open basins removed; new usage options
+ Plot level, developed, suitable for heavy goods traffic






