This new development is ultra-modern and ideally located directly at Bremer Kreuz. The property on offer has a hall area of approx. 29,000 m² with a WGK 3 film (hazardous goods, lithium-ion batteries), which enables the storage of highly water-polluting substances. The extensive hall area can be flexibly divided into sub-units from approx. 7,700 square meters.
Completion of the new building is planned for summer 2024.
- Office and social space: approx. 740 m²
- Divisible: from 8,000 m² or by arrangement
- Access: approx. 30 dock levellers, 3 sectional doors at ground level
- Hall height 12.00 m floor to ceiling
- Floor load 50 kN/m²
- Entire building equipped with WGK 3 foil
- Sustainable construction according to DGNB Gold (targeted)
Further equipment features:
Structural condition: First occupancy






